Mainland grid
posted 14 days ago  ·  
205 views  ·   0 comments  ·  

In relation to your Inside Page writeup (May 8, 2019), I support the proposal of Engr. Hector Sanchez of power connection from mainland grid. We can get away the gensets, and the unreliable hydro power plants during summer season. Tiwi Geothermal Plant, powers the grid of mainland, and can supply the requirements of the island for the whole year round. Technology is changing, and we have to replace the diesel big gensets that caused pollution (air, noise and water).

Rudy Tablate, PEE, CE


0 comments
new to catanduanestribune.com?
connect with us to leave a comment.
connect thru
Cancel
Cancel
Cancel
home home album photo album blogs blogs